These are Solar Packages that don't require the installation of Battery to reduce initial cost.
* PV: 10 pcs - 550w PV Panels
* INVERTER: 1 unit - 5 kW, 1P, String Inverter
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 577.5 kWh /mo.
= P6,930 /mo. (@ P12 per kWh)
* PV: 16 pcs - 550w PV Panels
* INVERTER: 1 unit - 8 kW, 1P, String Inverter
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 924 kWh /mo.
= P11,088 /mo. (@ P12 per kWh)
* PV: 37 pcs - 550w PV Panels
* INVERTER: 2 units - 10 kW, 1P, String Inverter
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 2,136.75 kWh /mo.
= P25,641 /mo. (@ P12 per kWh)
These are Solar Packages that are installed with Battery and Hybrid Inverter
* PV: 10 pcs - 550w PV Panels
* INVERTER: 1 unit - 5 kW, 1P, Hybrid Inverter
* BATTERY: 1 unit - 10 kWh, 48V, 200AH, LiFePo4 Battery
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 787.5 kWh /mo.
= P9,450 /mo. (@ P12 per kWh)
* PV: 16 pcs - 550w PV Panels
* INVERTER: 1 unit - 8 kW, 1P, Hybrid Inverter
* BATTERY: 1 unit - 10 kWh, 48V, 200AH, LiFePo4 Battery
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 1,134 kWh /mo.
= P13,608 /mo. (@ P12 per kWh)
* PV: 30 pcs - 550w PV Panels
* INVERTER: 1 unit - 16 kW, 1P, Hybrid Inverter
* BATTERY: 2 units - 10 kWh, 48V, 200AH, LiFePo4 Battery
* with Protective Devices like Circuit Breakers, Surge Protection Device, panelboard, wires and more
* with Mounting Materials like Railings, Clamps and more
* Net Metering-Ready
* Free Service Entrance Remodeling 60A and below Main Breaker
ESTIMATED SAVINGS
= 2,212.5 kWh /mo.
= P26,550 /mo. (@ P12 per kWh)
NOTES: (1) Net Metering is a government program that lets solar plant owners to sell their excess energy to the utility company (like Meralco). The sold energy will be deducted from the bill as credit so solar plant owners with net metering SHOULD NOT expect to receive cash. (2) Sold energy is cumulative, meaning that if you get a zero bill today but still have higher energy sold, it will be carried over to the next month.
If CONSUMPTION / LOADS is lower, then PRODUCTION / HARVEST is also lower due to the no storage capability of On-Grid Systems.
When there is NO GRID or GENSET supply, On-Grid System will not run. This is to avoid any inconvenience when Utility is doing maintenance.
Hybrid System has longer ROI than On-Grid System due to the addition of Battery cost.
Return on Investment (ROI) time will shorten as utility rate increase such as in provinces such as Ilocos and Camarines Sur where costs are around P19 and P16 per kWh respectively. This is because your yearly savings will increase, making the ROI result to decrease.
SYSTEM WARRANTY shall be “VOID” if system is upgraded or modified without the consent or approval of BILLBREAKER SOLAR.
To still lower the bill, apply for Net Metering so you can sell excess energy to the GRID.
CT Clamp, also known as LIMITER, is installed to prevent unwanted export of energy to the GRID if there is no Net Metering applied.
Net Metering application is only allowed on 100 kW Systems and below as per Renewable Energy Act of 2008.
NET METERING process takes 3 to 6 months depending on LGU & Meralco’s approval.
NET METERING-READY PACKAGE includes: (1) Installation of REC Meter Base, (2) PEE Sign & Seal of Solar PV Design, (3) Forms. Requirements such as 2 valid Government ID, Property Title, Property Tax Declaration, Electric Bill, Authorization Letter, Front of House Photo are for the submission of the plant owner.
Owner needs Service-Entrance remodeling for utility compliance such as Meralco. Service-Entrance remodeling includes installation of new disconnect switch, conduits, and meter base to comply. Additional FEES apply.
Transfer or Bill Change Name from previous electric meter owner is NOT INCLUDED.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.